Test the finished mating pair and cable assembly at the defined continuous and peak duty, with the specified conductor, enclosure temperature and airflow. Measure near the contact and termination after temperatures stabilize, then repeat after relevant cycling or vibration. JNICON can provide the drawing and available test data for the selected part; the OEM should agree acceptance limits for its system.